For Desanding Plant for Slurry Separation with a processing capacity of more than 360 m3/h, we will use Multi-Unit Desanding Plants, a combination of multiple equipment to complete Slurry Separation. Due to the construction process characteristics of the TBM and Bored Pile project, we can choose the on-site configuration plan of the equipment.Desander cones can be installed between one and three 10" desander cones, each cone can process 500 GPM and makes a separation between 45 and 75 μm. .
{plog:ftitle_list}
The MiniVac oil sludge drum vacuum system is powered by a quiet running 20 hp / 15 kW water-cooled diesel engine fitted with electric start and spark arrestor.The powerful blower generates high air flow to convey liquids through long lengths of hoses. Material, inluding oily sludge, recovered by MiniVac is deposited into common open head drums (55 gal / 205 L) by means .
When it comes to horizontal directional drilling (HDD), the mud system weight plays a crucial role in the success of the operation. The unit weight of the drilling mud used in HDD projects needs to be carefully monitored and maintained within a specific range to ensure optimal performance. On Feb 5, 2018, it was emphasized that the unit weight needs to be within a range between 9 and 10 pounds per gallon. This is essential for various reasons, including preventing the flow of formation fluids into the hole and ensuring the stability of the borehole.
The MA07 mixing system is a continuous Bentonite mixing and supply system for all HDD drilling rigs with integrated Bentonite high-pressure pump. The special tank and pump system ensures continuous mixing and simultaneous delivery of drilling fluid. The MA07 is available in 2 drive
Drilling Mud in HDD
Drilling mud, also known as drilling fluid, serves multiple purposes in HDD operations. One of its primary functions is to provide hydraulic support to the borehole walls, preventing collapses and maintaining stability during the drilling process. In addition to this, drilling mud also helps to cool and lubricate the drill bit, carry cuttings to the surface, and seal off permeable formations to prevent fluid loss.
Achieving the right unit weight of the drilling mud is critical for the success of the HDD project. The ideal range of 9 to 10 pounds per gallon strikes a balance between providing sufficient hydraulic support and preventing excessive pressure on the formation. Water, with a unit weight of 8.34 pounds per gallon, serves as a benchmark for comparing the density of the drilling mud.
Mixing the Mud in HDD
Mixing the drilling mud to achieve the desired unit weight requires precision and careful attention to detail. Various components, such as bentonite, polymers, and weighting agents, are added to the base fluid to adjust the density of the mud. The mixing process must be carried out systematically to ensure uniform distribution of the additives and consistent properties throughout the mud system.
Properly mixed drilling mud not only helps to maintain the desired unit weight but also enhances the overall performance of the HDD operation. A well-designed mud system can improve drilling efficiency, reduce downtime, and minimize the risk of borehole instability. Regular monitoring and testing of the mud properties are essential to ensure that the unit weight remains within the specified range.
Mud Weight (density of fluid) Sand content analysis Hardness/chlorides determination
Inline shear pumps come in various designs, each suited for specific applications. Common .